Midtfjellet wind park

Midtfjellet wind park

Midtfjellet wind park

Nordic Crane Stangeland was commissioned to transport and install a total of 21 2.5 MW wind turbines at the Midtfjellet wind farm.

The work on the installation of the turbines was challenging because of the steep roads and relatively small parking position by each turbine. Extensive planning was thus required to be able to rig the cranes with a jib. The wind turbines were assembled using a 500-tonne mobile crane. At times Nordic Crane had two different cranes working on installation of the turbines at the same time.

Failed to connect to MySQL: Access denied for user 'wwwnordiccra'@'localhost' (using password: YES)

Facts

  • Project: Midtfjellet Wind Farm
  • Place: Midtfjellet
  • Timeframe: August-December 2012
  • Project manager: Robert Tunmats

Midtfjellet, Fitjar