Heavy lift

Drotningsvik

Drotningsvik

Nordic Crane was commissioned to lift a temporary bridge into place over the national road Rv 555 at Drotningsvik in Bergen.

Read more about Drotningsvik »»

Gullfaks

Gullfaks

Replacing crane no. 4 on the Gullfaks A platform looked to be a very costly project for Statoil. The alternative to using a mobile crane to replace the crane was to use heavy lift vessels, such as the Saipem 7000 for example, entailing huge costs for the project.

Read more about Gullfaks »»

Midtfjellet wind park

Midtfjellet wind park

Nordic Crane Stangeland was commissioned to transport and install a total of 21 2.5 MW wind turbines at the Midtfjellet wind farm.

Read more about Midtfjellet wind park »»

Ormen Lange test pit

Ormen Lange test pit

In connection with the construction of a test pool for a subsea compression system at Shell's Ormen Lange plant in Aukra, Nordic Crane Stangeland was commissioned with loading up all the components from Aker's yard in Egersund, unloading them at Aukra, and transporting them through the facility to the test pit.

Read more about Ormen Lange test pit »»