Engineering

LTR1100 Draugen

LTR1100 Draugen

When one offshore crane on Draugen platform crashed during a load test alternative load handling devices had to be developed urgently.

Read more about LTR1100 Draugen »»

Special design of lifting gear

Special design of lifting gear

Engineering department at Nordic Crane regularly delivers specially designed lifting equipment to various customers in the offshore and onshore industry.

Read more about Special design of lifting gear »»

Replacement of a cooler in Hammerfest

Replacement of a cooler in Hammerfest

This project entailed removing an old cooler weighing 180 tonnes and installing a new 245-tonne cooler using two 600-tonne crawler cranes.

Read more about Replacement of a cooler in Hammerfest »»

Transport and loading up of cranes at National Oilwell

Transport and loading up of cranes at National Oilwell

Nordic Crane has conducted numerous internal transport and loading operations of offshore cranes at NOV's workshop in Kristiansand.

Read more about Transport and loading up of cranes at National Oilwell »»

Ormen Lange Test Pit

Ormen Lange Test Pit

In connection with the construction of a test pool for a subsea compression system at Shell's Ormen Lange plant in Aukra, Nordic Crane Stangeland was commissioned with loading up all the components from Aker's yard in Egersund, unloading them at Aukra, and transporting them through the facility to the test pit.

Read more about Ormen Lange Test Pit »»